Welding modifications and repairs on all types of metal door frames

Steel door frame and fire door repairs for Perth builders

Hinges, strikers and frames fixed properly on site. Welded, ground and primed ready for paint, so the door works and the frame looks right.

Commercial steel door frame with welded strike cut-outs on a fit-out site

What we do

Services

Commercial and residential steel door frame work, done as a subcontractor on live building sites.

01

Hinge relocation and replacement

The old hinge position is welded up, filled, ground, sanded and primed. The new hinge is cut in, welded and finished to the same standard.

02

Striker plate cut-ins

Striker positions cut and welded into steel frames, including bricked-in frames that need a deadlock striker.

03

Electrical striker modifications

Frames modified to take electric strikers for security and access control installs, including high-security 3mm frames.

04

Door swing reversals

Hinges and strike swapped to change a door's handing or reverse its swing when a frame went in the wrong way.

05

Double-door mullion legs

Mullion legs supplied and installed on double-door frames.

06

Frame leg extensions and rust repairs

Frame legs extended where they finish short of the floor, and rusted frame bases cut out and spliced.

07

Frame replacement

Damaged or unsuitable steel door frames removed and replaced, including galvanised frames.

08

Fire door header changes

Frame headers removed and dropped down to suit the door.

09

Steel plate welding

Steel plates and post plates supplied and welded on site.

Materials and parts for frame repairs are included. Painting and final finishing are left to your painter.

Who we work with

Trusted on Perth sites

We work as a subcontractor for builders and security and access control contractors across Perth, on commercial and residential projects.

Builders we've worked with include

Our work

Before & after

Every repair starts rough. Here's the same frame before and after we've finished with it.

BeforeSteel frame jamb cut out and welded with new striker plates, weld still unground
AfterThe same jamb ground smooth and primed, with the strikers fitted

Striker cut-in: welded into the jamb, then ground smooth and primed.

BeforeGalvanised frame opened up on a rendered wall
AfterGalvanised frame with new strikers welded in and masked for the painter

Galvanised frame opened up, strikers welded in and masked ready for the painter.

BeforeRaw steel door frame head with a gap above it
AfterThe same frame head set level with a laser, filled and primed

Frame head reset level with a laser, filled and primed ready for paint.

Finished work

Contact

Get in touch

Send through the site address, the number of frames and a few photos, and we'll come back to you with a price.

Get a quote
Phone
0456 222 446
Email
info@doorframerepairs.com.au
Service area
Servicing all of Perth metro